Posted by julieanddavid on 9/28/2010 7:40 AM | Comments (2)
A SECTION of Blackpool Promenade is to be closed to traffic to enable a massive regeneration project to be completed. The road will be closed for five months while the £15.5m Tower Festival Headland is finished on the shoreline opposite Blackpool Tower.
As part of the plan – designed to link the iconic structure with the seafront – highways chiefs plan to permanently reduce the current four lanes of traffic down to two between New Bonny Street and Talbot Square.
The disruption will begin in November when workmen close the route with just one lane kept open.

Digg It!DZone It!StumbleUponTechnoratiRedditDel.icio.usNewsVineFurlBlinkList

Comments

Add comment


 

biuquote
  • Comment
  • Preview
Loading